Wilton Row
SW1
Project overview
Scope of work
Soft Strip
Demolition of internal structures and roof
Temporary works with façade retention
Steel structures to internal floors and roof
New intermediate floors throughout including roof
Creation of 70m2 basement
Cavity drain membrane system
Installation of sumps and pumps
Creation of lift pit and lift core throughout the building
Client:
Leconfield Property Group
Structural Engineer:
DSA Engineering
Architect:
Lewis Stroud
Duration:
24 Weeks
Size:
250 sq/m