Noble Structures

info@noblestructures.co.uk    0207 148 1595

Navigation
  • Home
  • About
  • Case Studies
  • Services
  • Blog
  • Contact
  • Home
  • About
  • Case Studies
  • Services
  • Blog
  • Contact
'

Kew Road

TW9

   

Kew Road

Project overview

Scope of work

  • Demolition of existing side elevations
  • Extensive temporary works to support existing property
  • Installation of steel structures
  • Creation of 6.5mtr deep, 350m2 basement to footprint including lightwells
  • Cavity drain membrane system
  • Installation of sumps and pumps
  • Creation of new side extensions
  • Stripped existing roof
  • Creation of new loft and roof structure
Client:Private
Structural Engineer:Inertia Structures
Architect:Hamilton King Architects
Duration:50 Weeks
Size:600 sq/m
Project Type:Structural

Kew Road

Blue Flamingo Support 21 March 2021Completed Projects

TW9

Share this Project

MORE CASE STUDIES

17 Brook Lane Business Centre,
Brook Lane North
Brentford
London
TW8 0PP



  • Home
  • Gallery
  • Services
  • Blog
  • Contact
© Noble Structures. Privacy policy. Cookie policy Website design by Blueflamingo. Photography by TradePhotographer.com

info@noblestructures.co.uk    0207 148 1595

Toggle the Widgetbar