Noble Structures

info@noblestructures.co.uk    0207 148 1595

Navigation
  • Home
  • About
  • Case Studies
  • Services
  • Blog
  • Contact
  • Home
  • About
  • Case Studies
  • Services
  • Blog
  • Contact
'

King Henry Road

NW3

   

King Henry Road

Project overview

Scope of work

  • Soft strip
  • Piling
  • Extensive temporary works
  • Creation of 3 adjoining 300m2 basements including front driveways with lightwells
  • New sewer connections
  • Cavity drain membrane system
  • Installation of sumps and pumps
Client: Private
Structural Engineer: Price Myers
Architect: F-A-L Architects
Duration: 28 Weeks
Size: 30 sq/m
Project Type: Structural

King Henry Road

Tim Admin 21 March 2021Completed Projects

NW3

Share this Project

MORE CASE STUDIES

17 Brook Lane Business Centre,
Brook Lane North
Brentford
London
TW8 0PP

 

  • Home
  • Gallery
  • Services
  • Blog
  • Contact
© Noble Structures. Privacy policy. Cookie Preferences Website design by Blueflamingo. Photography by TradePhotographer.com

info@noblestructures.co.uk    0207 148 1595

Toggle the Widgetbar