The Avenue, W13

A large basement was constructed for this new build project.


Key statistics

  • Basement Size - 550m²
  • Basement ceiling height - 2400mm
  • Project Duration - 24 weeks
  • Property Status – New Build


Summary of works

  • Established site mobilization and site set up
  • Contiguous piling to adjacent buildings
  • Temporary works design & installation to surrounding public highways
  • Open excavation of 3000m3 of earth
  • Construction of 550m2 basement slab
  • Construction of RC walls to ground floor level dividing the basement into 5 properties